Television film crews will be returning to High River on Monday, March 26 and Tuesday March 27th to continue production of a popular drama.

Filming will take place in the downtown core on 4 Ave. S.W. as well as 602 3 St. S.W. on March 26. Filming will then move to an indoor set on 3 Avenue S.W. on March 27.

Fouth Ave. will be closed on Monday from 1 St. to Macleod Trail from approximately 7 a.m. to 7 p.m.

Parking restrictions will also be in place on Monday on 3 Street from Macleod Tr.  to 7 Ave. (west and east sides). There will be additional parking restrictions on 7 Ave. from 3 St. to 2 St. (north and south sides) from approximately 6 a.m. to 2 p.m.

They will have crews on site to conduct intermittent traffic control on Monday from 8 a.m to 1 p.m.

In order to minimize the disruption, the majority of the crew vehicles will be parked in lots located at 128/130 4 Avenue S.W. and 135 Macleod Trail S.W. throughout filming.